Skip to main content
Editor's pickStartup

Copper Lead And Zinc Smelting Plant Setup

Incorporate your Copper Lead And Zinc Smelting Plant Setup with expert CA/CS support โ€” SPICe+ filing, DIN, DSC, PAN, TAN, MoA & AoA drafting included.

Turnaround
7โ€“14 Working Days
โ‚น
Starts from
โ‚น1,57,499
Money-back accuracy
Guaranteed
Total starting from
โ‚น1,57,499
Professional + estimated government fee
Professional feeโ‚น57,499 starts with
Government fee (est.)โ‚น1,00,000 - โ‚น5,00,000
Turnaround7โ€“14 Working Days
Money-back accuracy. CA/CS specialist. Tracked client portal.
WhatsApp
CONFIRMEDverified 25 Aug 2026

Dedicated specialist

CA-led, named point of contact

Tracked client portal

Real-time status, end-to-end

Money-back accuracy

Refile-free if our error

Flat-fee pricing

No hidden charges, ever

About this service

Copper Lead And Zinc Smelting Plant Setup is a key regulatory filing administered by MoEFCC for EC (Category A โ€” EAC-1 Industry). Co-regulators: CPCB (emission/effluent norms); State Pollution Control Board (Consents + Hazardous Waste Authorisation); Indian Bureau of Mines (IBM) for captive mine plan approval; DGMS for mine safety; AERB for radioactive by-products; Central Ground Water Authority (CGWA) for groundwater abstraction NOC.. Filing is executed via Same as Carbon Black โ€” Form 1, Form 1A, Form 1M, TOR Application, EIA/EMP Report, Form 4 (compliance). Additionally: under **Environment (Protection) Act, 1986** + **EIA Notification 2006** (S.O. 1533 dated 14.09.2006) โ€” Schedule 1 **Item 3(a): "Primary Metallurgical Industry (notified processing routes)"** โ€” Category A. The "notified processing routes" include: copper smelting (โ‰ฅ50,000 TPA), lead smelting (โ‰ฅ50,000 TPA), zinc smelting (โ‰ฅ50,000 TPA), aluminium smelting (โ‰ฅ2,00,000 TPA โ€” separate sub-category). **Environment (Protection) Rules, 1986 โ€” Schedule I** (industry-specific emission/effluent standards for non-ferrous metallurgical industries โ€” Notification G.S.R. 176(E) dated 02.04.1992, revised 2008, 2016). **Water (Prevention and Control of Pollution) Act, 1974** โ€” Section 25. **Air (Prevention and Control of Pollution) Act, 1981** โ€” Section 21. **Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016** โ€” Rule 5 (authorisation for hazardous wastes โ€” arsenic trioxide, lead slag, zinc dross, copper slag). **Public Liability Insurance Act, 1991**. **Mines and Minerals (Development and Regulation) Act, 1957** โ€” Section 4 (captive mining lease if integrated with captive mine). **Atomic Energy Act, 1962** โ€” for any monazite / rare earth by-products (AERB approval). **Mines Act, 1952** + Coal Mines Regulations 2017 โ€” Directorate General of Mines Safety (DGMS) approval for captive mine.. Our specialist-led team ensures full compliance with statutory documentation, eligibility verification, and expedited government approval.

Eligibility & thresholds

Minimum
  • Valid identity & address proof of applicant
  • Active PAN & registered business premises
  • Authorized representative authorization
Maximum
  • Compliant under applicable regulatory laws
  • No pending statutory disqualifications
  • Valid across authorized operational jurisdictions
Statutory floor
  • Pre-filing statutory documentation verification
  • Official statutory fee schedule as per authority
  • Mandatory periodic compliance filings post-approval

What's included

Everything in one transparent fee โ€” no add-ons, no surprises.

Investor-Centric AOA Drafting
If you plan to raise institutional funding, standard Articles of Association (AOA) will not suffice. Venture capitalists demand specific clauses regarding right of first refusal (ROFR), tag-along/drag-along rights, and anti-dilution provisions. Our elite corporate lawyers draft sophisticated AOAs that anticipate future funding rounds, preventing costly and time-consuming structural overhauls when you secure term sheets.
Complex Multi-Founder Structuring
Co-founder disputes are the leading cause of early-stage startup failure. We don't just register your company; we advise on optimal equity splits, director roles, and authorized capital distribution. We provide templates for Co-Founder Agreements and vesting schedules, ensuring that the foundational relationship between partners is legally documented and aligned for long-term stability.
Rapid SPICe+ Processing Engine
Time is of the essence for startups. We utilize an advanced compliance engine that preemptively validates all data entered into the SPICe+ (INC-32) form. By cross-referencing PAN databases, checking DIN eligibility, and formatting registered office proofs perfectly, we eliminate typographical errors that typically cause frustrating ROC resubmission delays, ensuring first-pass approval.
Strategic Authorized Capital Advisory
Determining your initial Authorized Share Capital is a delicate balance. Set it too low, and you'll immediately face high fees to increase it during your first seed round. Set it too high, and you pay unnecessary upfront government stamp duty. We analyze your 12-to-18-month funding roadmap to recommend the exact optimal capital structure that minimizes immediate costs while accommodating your immediate growth.
ESOP Implementation Framework
Attracting top-tier talent in the startup ecosystem often requires offering Employee Stock Ownership Plans. A Private Limited Company is the only structure that efficiently supports this. As part of our premium advisory, we structure your initial cap table to accommodate a future ESOP pool seamlessly, ensuring you are ready to incentivize your founding team.
Comprehensive Post-Incorporation Toolkit
Receiving the Certificate of Incorporation is just the starting line. Within the first 30 to 180 days, you must open a bank account, appoint a statutory auditor (ADT-1), and file the Commencement of Business (INC-20A). We provide a complete post-incorporation execution service, handling these mandatory compliance milestones so you can focus entirely on product development and sales.
Government Fee Breakdown

Government charges only โ€” separate from I-Pro's professional fee. All figures verified as of 25 August 2026.

Fee ComponentAmount (โ‚น)Basis / Authority
Copper Lead And Zinc Smelting Plant Setup Statutory Feeโ‚น1,00,000 - โ‚น5,00,000Official government fee schedule (separate from professional fee)Statutory Authority
Total Government Feeโ‚น1,00,000 - โ‚น5,00,000(for default assumptions stated below)

Government charges only โ€” separate from I-Pro's professional fee. Verified 25 August 2026.

Required documents

Each list identifies exactly what to provide โ€” and what you do not need to submit. Use the accordions to expand.

How it works

Each step is labelled with who performs it โ€” Customer, I-Pro, or the Regulator. Form names are linked to the official portal.

  1. 1
    Customerโฑ Day 1

    Requirement Review & Eligibility Check

    Initial consultation to verify statutory eligibility and compile required prerequisites.
  2. 2
    I-Proโฑ Day 1โ€“2

    Document Verification & Pre-Scrutiny

    Comprehensive audit of applicant KYC, business records, and address proofs.
  3. 3
    I-Proโฑ Day 2โ€“3

    Statutory Form Preparation & Drafting

    Drafting official application forms, affidavits, and supporting declarations.
  4. 4
    I-Proโฑ Day 3โ€“4

    Submission on Competent Portal

    Electronic filing on official department portal with fee payment and receipt generation.
  5. 5
    Regulatorโฑ Day 4โ€“7

    Authority Scrutiny & Liaison

    Tracking department scrutiny, responding to officer queries, and milestone alerts.
  6. 6
    Governmentโฑ Day 7โ€“10

    Final Approval & Certificate Delivery

    Official statutory certificate delivery along with ongoing compliance guidance.

Frequently asked questions

Everything you need to know about this service.

Client feedback

What clients say

Real reviews from founders, finance leads and operators who used our Copper Lead And Zinc Smelting Plant Setup service.

No reviews yet

Be the first to share your experience with Copper Lead And Zinc Smelting Plant Setup.

Call ExpertWhatsApp
Copper Lead And Zinc Smelting Plant Setup | I-Pro Solutions